Who We Employ

CENTRAL OFFICE

Level I installers have 6 months – 2 years of experience. Level I’s pull, place, lace/stitch high pair copper, power, and fiber optic cables in telecommunications central offices. In addition, they assist in mounting, leveling, and aligning central office equipment bays in accordance with plans and specifications. Also assist in installation of basic ironwork, fiber tray installation, and earthquake bracing.
Level II installers have 2 – 4 years experience. In addition to the tasks performed by level I installers, Level II’s install and secure transmission and switching equipment such as DACS, Muxes, OC-48s etc. into central office racks and frames. Responsible for terminating high pair telecommunications cable to transmission equipment and blocks performing wire wrapping and BNC connections terminations as well as dressing cable and wire management. Familiar with installation of various manufacturers of transmission and switching equipment such as Lucent, Nortel, Fujitsu, Alcatel, Tellabs, Cienna, etc.
Level III installers have 5 – 6 years of experience. In addition to the takes performed by Level II installers, Level III’s are experienced in terminating fiber optic cables to patch panels as well as to central office transmission equipment. In addition, perform termination of DC power cables to transmission equipment. Assist in performing testing, commissioning, test and turn-up of installed equipment. Remove, decommission obsolete or malfunctioning transmission equipment.
Level IV installers have 6 – 10 years of experience. Generally referred to as the “In Charge”, Level IV installers are responsible for creating the MOP (Method of Procedure) and are responsible for providing work assignments to the lower level installers that report to him. Performs installations of central office batteries and terminates DC power cables to the BDFB. Responsible for communicating job progress, proposed changes to scope of work, as well as materials and labor needs to project engineer. Responsible for testing, commissioning, test, and turn-up of all equipment installed within the scope of work.
Equipment test and turn up, integration and testing of transmission and switching equipment.

MANAGEMENT

Manages a project’s scope, budget, timeline and technical resources.
Manages construction labor and materials, administers budget, and requests change orders.

NETWORK

Remote monitoring, troubleshooting and maintenance of telecommunications networks as well as testing of network hardware and software.
Orders & provisions circuits (DS—DS3, T-1-T3), diagnoses & troubleshoots network outages, implementation of newly installed circuits, documentation of in circuit databases.
Circuit cross connects, switch configurations, remote switch acceptance testing, documentation.

SWITCH & TRANSPORT

Maintenance of central office switching equipment (Alcatel-Lucent, Ericsson, Cisco, NSN)
Test and turn up of telecommunications circuits (DS0-DS3), installation, configuration of transmission and optical carrier equipment Network Techs – SONET, VOIP, TDM network configuration, testing and troubleshooting.
Network techs should be able to troubleshoot and resolve various problems within the server, mainframe, desktop, and LAN environment and provide technical assistance with hardware and software.
Customer premise equipment installation, Dmarc extensions, T1 test and turn up.

DC POWER

These installers are equivalent to Central Office Installers Level I – III on the transport / switch installation scale described above. These installers run, pull, place, and stitch DC power cable in Central Offices. They will also perform H-Taps on DC power cables.
These technicians are equivalent to Level IV Central Office Installers on the transport / switch installation scale described above. DC Power Technicians manage crews of DC Power Installers by providing work assignments, coaching and instructing, and evaluating work performance. They possess a thorough knowledge of AC and DC power. They terminate power cables to transport and switch equipment as well as to the BDFB. They have experience installing equipment manufactured by Marconi, Emerson, Tyco, PECCO, Valere etc. Experienced in creating MOPS, reading blueprints and schematics. Installation of Central Office batteries and rectifiers. Also experienced in testing network power systems.

ENGINEERING

Certified Cisco engineers such as CCNA, CCNP, CCIE etc.
Creates detailed specifications for installation of telecom networks, site surveys, creation of drawings.
Outside Plant engineering and design.
Design large scale telecommunications networks/systems, Site walks, creation of drawings.
Drafters and designers will have experience in civil and commercial application of AutoCAD 2000-2013.

Who We Support

  • Central Offices
  • Telecom Carriers
  • System Integrators
  • Our Latest Resources

    What’s new in the world of work? check out the latest highlights, including staffing trends, top insights and more.

    Outsource News
    Maneuvering Your Job Search Through a Pandemic

    A global pandemic means times are uncertain, stressful and even a bit frightening. While the COVID-19 outbreak has not only caused a health crisis it has also caused an economic crisis as well…

    Outsource News
    Be Ready to Answer These Questions at Your Next Job Interview

    Whether this is your first job interview or you’ve done several already, you will probably find yourself with a case of nerves as it begins…

    Outsource News
    How Much Will It Cost to Become an Electrician?

    Are you considering becoming an electrician? If so, you’ll want to think about the return you can expect on the investment you will make in education and training…